Solution

The Vale Maravilhas III

Vale Maravilhas III

[The Vale Maravilhas III]

FKB concluded last month, another big supply for the Mining sector. In all, 15 tons of equipment for the Vale Maravilhas III Project in Itabirito - MG, with 38 flanged knife gate valves, model VGU-11, 2" to 30", with manual, electric, hydraulic and pneumatic drives.

Talk to our technical team

We are available from Monday to Friday from 7:30 am to 5:00 pm (Brasília)

[email protected] +55 (11) 94153-8033 +55 (11) 4693-2042